Back to main page

 

Project

Disassembly of prestressed concrete beam at Kaiserstuhl

Again a successful operation with our LTM 1400 – 7.1.

With nice weather our crane LTM 1400 and our 50 tons traverse with 9 meters length was used for our customer at Kaiserstuhl to dissemble the prestressed concrete beam. Our customer was totally satisfied with this operation.